<p>You do not have the latest version of Macromedia Flash Player or Javascript is disabled. This web site makes use of <a href="http://www.macromedia.com/software/flash">Macromedia ® Flash TM software</a>. Why not download and install the latest version now? <a href="http://www.macromedia.com/go/getflashplayer">Install Macromedia Flash Player</a>.</p>
TEVA
Ground Floor, Building V, Harlow Campus, Harlow
Sector Commercial
Size 15,000 sq.ft.
Value £1.2M
Duration 15 Weeks
Architect Cushman Wakefield
Quantity Surveyor Cushman Wakefield
The works involved the partial stripout of an existing Cat B fitout, to enable the existing floor layout to be remodelled, creating a new reception and cafe area. The relocation of the existing demountable partitioning was also required to create conference and training facilities with a full audio visual system. There were modifications to the mechanical and electrical installation, including works to the comms room.