ICAEW
<p>You do not have the latest version of Macromedia Flash Player or Javascript is disabled. This web site makes use of <a href="http://www.macromedia.com/software/flash">Macromedia ® Flash TM software</a>. Why not download and install the latest version now? <a href="http://www.macromedia.com/go/getflashplayer">Install Macromedia Flash Player</a>.</p>

The Institute of Chartered Accountants of England & Wales

Building 900 The Hub, Milton Keynes

Sector
Finance

Size
30,000 sq.ft.

Value
£1.5M

Duration
13 Weeks

Architect
Pringle Brandon

Quantity Surveyor
Sense Cost Consultant

 


This project involved the fitting out from Cat A of approximately 30,000 sq.ft of office space over 5 levels of Building 900 The Hub. 
The works were carried out over a phased programme with level 4 being a key section as it allowed the ICAEW to vacate their existing offices. The majority of the area provides for open plan office space on floors 2 to 4 and incorporates a small degree of compartmentalisation to the perimeter of the floors through the use of solid and glazed partitions. 
The ground floor comprises a post room and main lift lobby area. 
A bespoke reception desk and credenza in conjunction with a partially tiled floor also provided for a high quality finish in the area.